Mark Pietz
Member
I bored the center of my aluminum disc so I could install or remove the pulley without removing the disc. Duh!
pulley stack drilled for roll pins. All eight allen head bolts safety wired. Pick-up sensor aligned with 9th tooth 90 degrees away from tdc. In operation, when the missing tooth passes the sensor 90 degrees btdc, it knows when to begin the countdown for whatever advance is required for the next ignition event. Gap is around 0.040" but is not super critical.
Tappet cover and oil pan installed with gaskets and also using "the right stuff". Is that stuff messy! Yesterday welded on the new ball stud on that bracket on the frame (when one runs without those nylon bushings, ball and relay tube go metal to metal and the ball loses). Got a salvaged section from ihon to "graft" in. I'm not much of a welder, but it will hold.



Weather permitting, next weekend the engine goes in.


Tappet cover and oil pan installed with gaskets and also using "the right stuff". Is that stuff messy! Yesterday welded on the new ball stud on that bracket on the frame (when one runs without those nylon bushings, ball and relay tube go metal to metal and the ball loses). Got a salvaged section from ihon to "graft" in. I'm not much of a welder, but it will hold.



Weather permitting, next weekend the engine goes in.


Last edited: