wow 6 months! What a bummer they took so long to perform a less than one day worth of work.
Thanks for the feedback on the lift kit doc and stay safe!
Thanks Jeff. I am staying safe on camp leatherneck. After all most 10 years and 5 deployments, I landed a desk job, so I have time to bother y'all.
The sandblasting should have only taken a day or two, but the guy had some family trouble and bailed on me. The only trouble is I couldn't get a hold of the guy, and when I did, he would always say he would bring it back the following week end. I had used him before and wanted to give him a chance.
While training in twenty nine palms for 8 weeks, I finally got the frame back. My friend who is doing the painting got the blasted frame painted in por15 before I got back. When I returned is when I ordered the CPT suspension kit.
I had pulled the head the year before for a gasket and the cylinders looked great, they still had cross hatching and no lip at the top of the cylinder. Since she was running well and not burning any oil, I put a gasket kit and freeze plugs in and rattle painted her up all pretty.
I figured by time I got the suspension, engine and transmission back in, the body would be ready. Wrong again. I had to call the sandblaster and tell him he had three days to return the rest of the truck before I reported it stolen.
The truck came back with everything but the steering wheel that he had dropped on the road while towing the truck, but still was not sandblasted.
A few phone calls and $80 an hour got me a new sandblaster, but with a few delays and a couple of trips back and forth, I got the tub back, but the underside was still not done! With the rocker cut out they where afraid to lift or turn it over, so with the help of a friend who built a custom rotisserie and some extra bracing, I took a week off before deploying and finally did it myself. If you want something done right...
Back from blaster #2. Still not done
Inspection hole cut in drivers rocker. No rust. Pained inside with por15 and welded back up (I make purple gloves look hot)
Bolted up in back
Bolted and clamped in front
Ready for finial blasting and head to afghanistan! Note new floor pans installed by Robert at kings marine. Robert also whipped up the rotisserie for the Scout in about six hours!
