So now onto the valve body...
First pulled the filter off the valve body assembly.
Then pulled off the pressure regulator spring retainer and then pulled the regulator valve and converter valve. They fall right out.
I then unscrewed the 13(not 14 as the instructions said) screws and separated the casting and the separator plate/transfer plate. A little care here pays off. There are 7 total balls in there and one on a spring. The instructions let you know to pay attention here.
Next was the shift valve end plate and the 1-2 shift control valve, the 1-2 shift valve, and the 2-3 shift valve and all of their springs.
Then came out the governor plug end plate and then the 1-2 shift valve governor plug, 2-3 shift valve governor plug, and the shuttle valve throttle plug.
At this point the directions said to go directly into drilling. My thoughts were that before I begin drilling and getting aluminum flakes down inside the shift selector valve channels I should disassemble the shift selector lever assembly. So here's what I did.(sorry if the terminology is wrong, none of this was in the directions)
pulled the park shaft assembly
Pulled the shifter connection shaft assembly and the valves
I pulled the 6 screws to remove the plate on the opposite side of the valve body and pulled the valve and spring assembly that was under the plate. The instructions don't tell me what this is.
There were 2 screws holding a small plate on the valve body. I pulled this plate and the valve assembly inside. I don't know what this one does too. It wasn't in the directions.
Back to direction instruction.
Pulled the 4 small screws and separated the separator plate and the transfer plate.
Now onto drilling......