PD's Drivetrain Upgrade

ihpartsjeff

Administrator & Owner
Staff member
This project has been long in the making and with the arrival of the Scout yesterday afternoon via transporter from tennessee we can now begin the progress.

Most would be very happy with this Scout as it already has a SOA lift with reverse shackle, front ARB differential, rear warn full float axle kit, a 'built' 727 torqueflite transmission, an atlas transfer case, and more. Take a look at the pictures as this Scout is no slouch. But where theres a will, theres a way and we at IH Parts America know how to take any vehicle to the next level.

So here is the list of upgrades that will be performed on this Scout while it is here -

1. The 727 torqueflite transmission will swapped out in favor of a B&M racing GM 700r4 transmission using a CPT transmission adapter for GM automatic to IH engine.

2. A Klune-V will be installed between the transmission and atlas transfer case.

3. A curry rock jock hi-pinion Dana 60 will be installed in the rear set-up with a ARB differential, 4.88 Yukon gears, 35 spline curry shafts, and 12" wildwood disc brakes w/ internal drum style parking brake.

4. We are going to build what is called a '609' front axle(not to be confused this is not a unimog 609 axle). The center section will be a hi-pinion 9" from hi-9 set-up with 4.88 reverse cut gears and a ARB differential. The center section will be mounted into a spidertrax housing equipped with dedenbear/reid racing 'c's and kingpin type knuckles. 4 piston wilwood aluminum calipers will be installed on custom 5 lug hub/rotors.

5. All new custom exhaust.

6. Rear 4-link coil suspension.

7. Front 3 link coil-over suspension.

Below are pictures of some of the products that we will be using on this build.

attachment.php


attachment.php


attachment.php


attachment.php


attachment.php


attachment.php


attachment.php


attachment.php


attachment.php


attachment.php


That's a tall boy can by the way and yes we plan on using the larger flex joints on this build.

attachment.php
 

Attachments

  • IMG_1018.JPG
    IMG_1018.JPG
    99.9 KB · Views: 6,007
  • IMG_1052.JPG
    IMG_1052.JPG
    117.8 KB · Views: 5,738
  • IMG_1053.JPG
    IMG_1053.JPG
    126.3 KB · Views: 5,729
  • IMG_1054.JPG
    IMG_1054.JPG
    121.2 KB · Views: 5,872
  • IMG_1059.JPG
    IMG_1059.JPG
    114.1 KB · Views: 5,660
  • IMG_1063.JPG
    IMG_1063.JPG
    118.8 KB · Views: 5,688
  • IMG_1065.JPG
    IMG_1065.JPG
    104.5 KB · Views: 5,682
  • IMG_1067.JPG
    IMG_1067.JPG
    89.7 KB · Views: 5,647
  • IMG_1210.JPG
    IMG_1210.JPG
    126.8 KB · Views: 5,654
  • IMG_1186.JPG
    IMG_1186.JPG
    38.9 KB · Views: 5,614
  • IMG_1262.JPG
    IMG_1262.JPG
    47.6 KB · Views: 5,558
Last edited:
Here are some pictures of the Scout upon arrival.

attachment.php


attachment.php


attachment.php
 

Attachments

  • IMG_1384.JPG
    IMG_1384.JPG
    113.2 KB · Views: 5,464
  • IMG_1385.JPG
    IMG_1385.JPG
    117.1 KB · Views: 5,490
  • IMG_1388.JPG
    IMG_1388.JPG
    98.8 KB · Views: 5,426
Last edited:
Pictures of the Scout before we begin the tear down which should begin within the next couple of weeks.

attachment.php


attachment.php


attachment.php


attachment.php


attachment.php


attachment.php


attachment.php


attachment.php


attachment.php
 

Attachments

  • IMG_1397.JPG
    IMG_1397.JPG
    109.8 KB · Views: 5,424
  • IMG_1399.JPG
    IMG_1399.JPG
    99.1 KB · Views: 5,460
  • IMG_1403.JPG
    IMG_1403.JPG
    110.1 KB · Views: 5,438
  • IMG_1401.JPG
    IMG_1401.JPG
    97.9 KB · Views: 5,454
  • IMG_1400.JPG
    IMG_1400.JPG
    115.6 KB · Views: 5,383
  • IMG_1402.JPG
    IMG_1402.JPG
    83 KB · Views: 5,381
  • IMG_1404.JPG
    IMG_1404.JPG
    143.4 KB · Views: 5,348
  • IMG_1405.JPG
    IMG_1405.JPG
    138.6 KB · Views: 5,417
  • IMG_1406.JPG
    IMG_1406.JPG
    125.7 KB · Views: 5,329
Last edited:
Darren and I got started on the project by first getting the Scout running. It came to us with a freshly installed afi throttle body fuel injection system installed by the owner. After a couple hours of testing circuits Darren found that the dui hei distributor wasn't wired properly for the afi harness. With the wiring corrected the Scout was started. After fixing a vacuum leak and timing the engine we had the Scout up and running good. After a test drive or two the Scout was pulled into the shop so teardown could begin.

First was the removal of the front axle and suspension.

attachment.php


That's one tight brake hose!

attachment.php


In the picture you can see the four main parts that need to be removed - the fang, shock tower, bumpstop mount, and shackle hanger.

attachment.php


attachment.php


Pic of the frame before some finish grinding is performed.

attachment.php


Darren took a break from some grinding and removed the rear suspension.

attachment.php


With the frame smoothed out it was time to move on into the interior.

attachment.php


Next was the removal of the transmission cover and atlas shifter assembly.

attachment.php


Followed by the 727 transmission......
attachment.php


.........and front section of the exhaust.
attachment.php



With all the parts removed we had a clean slate to start reassembling.

attachment.php
 

Attachments

  • IMG_1455.JPG
    IMG_1455.JPG
    106.2 KB · Views: 5,346
  • IMG_1456.JPG
    IMG_1456.JPG
    100.9 KB · Views: 5,235
  • IMG_1457.JPG
    IMG_1457.JPG
    69.9 KB · Views: 5,285
  • IMG_1458.JPG
    IMG_1458.JPG
    105.8 KB · Views: 5,303
  • IMG_1460.JPG
    IMG_1460.JPG
    84 KB · Views: 5,254
  • IMG_1461.JPG
    IMG_1461.JPG
    105.3 KB · Views: 5,272
  • IMG_1463.JPG
    IMG_1463.JPG
    124.4 KB · Views: 5,246
  • IMG_1466.JPG
    IMG_1466.JPG
    127.5 KB · Views: 5,389
  • IMG_1467.JPG
    IMG_1467.JPG
    118.3 KB · Views: 5,263
  • IMG_1468.JPG
    IMG_1468.JPG
    94.8 KB · Views: 5,228
  • IMG_1469.JPG
    IMG_1469.JPG
    129 KB · Views: 5,273
Last edited:
Nice pile of good used parts(all sold and long gone by the way).

attachment.php


The CPT transmission adapter Plates were first bolted on.

attachment.php


You can see how the spacers mount between the flexplate and torque convertor adapter with the supplied 3/8" bolts.

attachment.php


We started the mockup of the Klune-V and atlas.

attachment.php


We have a couple different transfer case adapters to choose from. We'll probably go with the adapter sitting on the table as it will allow the crossmember to be tucked up inside the frame rails compared to the adapter that is currently mocked into place.

attachment.php


Dan @ RuffStuff specialties( ruffstuffspecialties.com - off-road fabrication parts ) came by with an assortment of brackets for the link suspension.

attachment.php
 

Attachments

  • IMG_1475.JPG
    IMG_1475.JPG
    137.1 KB · Views: 5,265
  • IMG_1470.JPG
    IMG_1470.JPG
    87.1 KB · Views: 5,268
  • IMG_1471.JPG
    IMG_1471.JPG
    92.8 KB · Views: 5,215
  • IMG_1472.JPG
    IMG_1472.JPG
    128.3 KB · Views: 5,294
  • IMG_1474.JPG
    IMG_1474.JPG
    115.5 KB · Views: 5,316
  • IMG_1473.JPG
    IMG_1473.JPG
    103.2 KB · Views: 5,184
Last edited:
The B&M 700r4 was installed next along with the Klune-V and atlas transfer case. With no body lift there was just enough room for the whole combo to fit without any cutting of the floor.

attachment.php


attachment.php


More parts started rolling in. We got the rest of the re joints in.

attachment.php


Darren started mocking them up in some of the various RuffStuff brackets.

attachment.php


attachment.php


attachment.php


With the rear housing setting under the Scout we had a better idea of what we needed to do.

attachment.php


Which was strengthen the frame so frame reinforcement plates were made out of 1/4" strap.

attachment.php


attachment.php


We decided to go with bilsteins new 14" rc9100 rock crawler series coilover. These are about as good as it can get. They have a real nice digressive valving that according to Bilstein this valving will greatly enhance vehicle stability while reducing impact harshness. Utilizing the digressive valving, wheel hop, front to rear/side to side weight transfer, erratic spring unload, and sway will greatly be reduced.

attachment.php


attachment.php


We also ordered in the matching curry truss to make mounting the top links a little simpler.

attachment.php
 

Attachments

  • IMG_1503.JPG
    IMG_1503.JPG
    126.8 KB · Views: 5,550
  • IMG_1504.JPG
    IMG_1504.JPG
    92.2 KB · Views: 5,224
  • IMG_1506.JPG
    IMG_1506.JPG
    136.9 KB · Views: 5,192
  • IMG_1508.JPG
    IMG_1508.JPG
    93.9 KB · Views: 5,137
  • IMG_1505.JPG
    IMG_1505.JPG
    127.7 KB · Views: 5,174
  • IMG_1510.JPG
    IMG_1510.JPG
    110 KB · Views: 5,162
  • IMG_1511.JPG
    IMG_1511.JPG
    118.1 KB · Views: 5,171
  • IMG_1512.JPG
    IMG_1512.JPG
    120.7 KB · Views: 5,164
  • IMG_1663.JPG
    IMG_1663.JPG
    85.4 KB · Views: 5,104
  • IMG_1567.JPG
    IMG_1567.JPG
    103.2 KB · Views: 5,038
  • IMG_1568.JPG
    IMG_1568.JPG
    132.6 KB · Views: 5,126
  • IMG_1569.JPG
    IMG_1569.JPG
    106 KB · Views: 5,047
Last edited:
Darren started installing the frame plates by first tacking them on.

attachment.php


attachment.php


attachment.php


attachment.php


Once they were tacked in place Darren spent the better part of a day welding them completely on.

attachment.php


attachment.php


Next Darren started the mockup of the upper axle link mounts.

attachment.php
 

Attachments

  • IMG_1664.JPG
    IMG_1664.JPG
    116.3 KB · Views: 4,980
  • IMG_1665.JPG
    IMG_1665.JPG
    90.1 KB · Views: 4,948
  • IMG_1666.JPG
    IMG_1666.JPG
    104.9 KB · Views: 4,962
  • IMG_1667.JPG
    IMG_1667.JPG
    125.5 KB · Views: 4,989
  • IMG_1674.JPG
    IMG_1674.JPG
    116.3 KB · Views: 4,923
  • IMG_1675.JPG
    IMG_1675.JPG
    116 KB · Views: 4,967
  • IMG_1676.JPG
    IMG_1676.JPG
    105.1 KB · Views: 4,943
Last edited:
With measurements made Darren began tack welding on all the various links and link mounts. We used hrew tubing for the mockup of the links and will replace with the actual dom when all measurements are finalized.

attachment.php


We mounted the lower links to frame outriggers from ruff stuff specialties.

attachment.php


Some last minute adjustments were made before we cycle the suspension to check fit.

attachment.php


Suspension at full droop. Pinion angle still looks good!

attachment.php


Pic of the upper links and mounts.

attachment.php


Once we remove the electric fuel pump and filter that is currently mounted above the axle we should be able to cycle the suspension upward another 2"-3".

attachment.php


Darren then tack welded in the coil spring mounts and popped in the coils.

attachment.php


And with the springs in we were able to set the Scout down on the coils for the first time.

attachment.php
 

Attachments

  • IMG_1677.JPG
    IMG_1677.JPG
    123.9 KB · Views: 5,814
  • IMG_1678.JPG
    IMG_1678.JPG
    103.8 KB · Views: 5,448
  • IMG_1680.JPG
    IMG_1680.JPG
    103.5 KB · Views: 4,924
  • IMG_1681.JPG
    IMG_1681.JPG
    96.8 KB · Views: 4,885
  • IMG_1682.JPG
    IMG_1682.JPG
    101.4 KB · Views: 4,891
  • IMG_1683.JPG
    IMG_1683.JPG
    92.3 KB · Views: 4,892
  • IMG_1684.JPG
    IMG_1684.JPG
    115.5 KB · Views: 5,567
  • IMG_1685.JPG
    IMG_1685.JPG
    96.7 KB · Views: 4,923
Last edited:
With the mock up of the rear suspension complete Darren then moved on to the mock up of the front suspension.

First the tru hi-9 third member was temporarily bolted on to the spidertrax housing.

attachment.php


attachment.php


Darren then placed the housing under the Scout and began mounting of the axle housing brackets.

attachment.php


In order to fit the housing Darren made a few cuts on the custom made link bracket.

attachment.php


At this point Darren and I couldn't decide on whether to make the front suspension either a 3, 4, or 5 link. We played around with some different setups but in the end I did not like the way the brackets looked on the housing and how big they were. The size of the brackets alone was making it difficult to locate the trackbar mount and with the huge size of the reid racing Dana 60 knuckles it was leaving no room to mount the front coilovers.
attachment.php
 

Attachments

  • IMG_1697.JPG
    IMG_1697.JPG
    56.9 KB · Views: 4,892
  • IMG_1698.JPG
    IMG_1698.JPG
    122.5 KB · Views: 5,183
  • IMG_1699.JPG
    IMG_1699.JPG
    96.7 KB · Views: 5,430
  • IMG_1701.JPG
    IMG_1701.JPG
    108.5 KB · Views: 4,952
  • IMG_1703.JPG
    IMG_1703.JPG
    113.3 KB · Views: 5,481
Last edited:
So these brackets were scrapped and smaller ones were tacked in place. At this point we made up our mines that the front suspension would be set up with what is called a 'missing link'. Follow along as Darren puts it all together.

attachment.php


Next Darren fabbed up the track bar mount.

attachment.php


attachment.php


The front Bilstein coilovers were set in place to make sure there was going to be no fitment problems.

attachment.php


At this point the suspension was manually flexed to check how good the setup was going to work. At this point ignore the pinion angle change as the mock up driveshaft we were using was too long and was forcing the pinion upward against the yoke. So far everything was looking good.

attachment.php
 

Attachments

  • IMG_1704.JPG
    IMG_1704.JPG
    95.7 KB · Views: 4,886
  • IMG_1705.JPG
    IMG_1705.JPG
    105.5 KB · Views: 4,928
  • IMG_1706.JPG
    IMG_1706.JPG
    111.5 KB · Views: 4,820
  • IMG_1707.JPG
    IMG_1707.JPG
    55 KB · Views: 4,793
  • IMG_1711.JPG
    IMG_1711.JPG
    109.4 KB · Views: 4,846
Last edited:
Happy with the overall lengths of the mock up links Darren began cutting the actual 2"x.250 wall dom that is going to be used.

attachment.php


attachment.php


Darren also began welding on the threaded inserts.

attachment.php


The third link mount was tacked on and the suspension flex retested.

attachment.php


This picture clearly shows why this suspension setup is known as a "missing link" since there is no upper link on the driver side of the axle.

attachment.php


attachment.php
 

Attachments

  • IMG_1708.JPG
    IMG_1708.JPG
    115.3 KB · Views: 4,886
  • IMG_1712.JPG
    IMG_1712.JPG
    113.3 KB · Views: 4,836
  • IMG_1714.JPG
    IMG_1714.JPG
    67.4 KB · Views: 4,753
  • IMG_1713.JPG
    IMG_1713.JPG
    108.8 KB · Views: 4,851
  • IMG_1716.JPG
    IMG_1716.JPG
    115.9 KB · Views: 4,849
  • IMG_1717.JPG
    IMG_1717.JPG
    125.5 KB · Views: 5,185
Last edited:
One problem with our setup was the track bar was hitting the third link mount on top of the housing upon suspension compression so each end of the 2"x.250 wall dom that was going to be used for the track bar would need about a 20* bend. Being that .250 wall tubing let alone 2"x.250 wall dom was way beyond protools recommended maximum wall thickness (even for our heavy duty super bender that we use here in the shop) it didn't take much to break the bender die.

attachment.php


So Darren turned up the heat on the welder and burned the piece back on and then added a huge 1/2" thick gusset to it.

attachment.php


After heating the dom tube to slightly under 400* we quickly slid the tube into the bender and began bending. Success!

attachment.php


Darren then cut the bar to size and tack welded on the threaded ends. With the track bar in place the suspension flex was retested.

attachment.php


attachment.php


At full stuff the track bar tucks nicely under the oil pan. There is now plenty of room between the track bar and third link mount.

attachment.php


attachment.php


attachment.php


attachment.php
 

Attachments

  • IMG_1718.JPG
    IMG_1718.JPG
    84.6 KB · Views: 4,780
  • IMG_1724.JPG
    IMG_1724.JPG
    105.5 KB · Views: 4,775
  • IMG_1729.JPG
    IMG_1729.JPG
    65 KB · Views: 4,783
  • IMG_1735.JPG
    IMG_1735.JPG
    115.9 KB · Views: 4,829
  • IMG_1736.JPG
    IMG_1736.JPG
    116.3 KB · Views: 4,828
  • IMG_1737.JPG
    IMG_1737.JPG
    118.1 KB · Views: 4,746
  • IMG_1738.JPG
    IMG_1738.JPG
    118.2 KB · Views: 4,736
  • IMG_1745.JPG
    IMG_1745.JPG
    116.6 KB · Views: 4,736
  • IMG_1749.JPG
    IMG_1749.JPG
    113.1 KB · Views: 4,748
Last edited:
Darren made the third link mount on the lower link permanent. He fabbed up some pieces of 1/4" plate and then welded/molded it all together.

attachment.php


attachment.php


attachment.php


More threaded inserts were welded into place as well as the third link which was finished off with the poly bushed end.

attachment.php


attachment.php


Darren then removed all the brackets which were tacked onto the frame and finished welding them all up.

attachment.php


attachment.php


And more of the dom links were prepped for welding on of the threaded inserts.

attachment.php
 

Attachments

  • IMG_1719.JPG
    IMG_1719.JPG
    123.9 KB · Views: 4,693
  • IMG_1722.JPG
    IMG_1722.JPG
    121.1 KB · Views: 4,724
  • IMG_1723.JPG
    IMG_1723.JPG
    112.1 KB · Views: 4,709
  • IMG_1721.JPG
    IMG_1721.JPG
    96.4 KB · Views: 4,696
  • IMG_1725.JPG
    IMG_1725.JPG
    102.8 KB · Views: 4,640
  • IMG_1720.JPG
    IMG_1720.JPG
    93.8 KB · Views: 4,606
  • IMG_1730.JPG
    IMG_1730.JPG
    111.2 KB · Views: 4,595
  • IMG_1731.JPG
    IMG_1731.JPG
    109.1 KB · Views: 4,574
Last edited:
With all the link and coil mounts welded up Darren then began permanently welding them on to the frame.

attachment.php


attachment.php


attachment.php


attachment.php


attachment.php


attachment.php


attachment.php


attachment.php


attachment.php
 

Attachments

  • IMG_1733.JPG
    IMG_1733.JPG
    97.1 KB · Views: 4,539
  • IMG_1734.JPG
    IMG_1734.JPG
    109.9 KB · Views: 4,548
  • IMG_1739.JPG
    IMG_1739.JPG
    114.7 KB · Views: 4,529
  • IMG_1741.JPG
    IMG_1741.JPG
    116.5 KB · Views: 4,524
  • IMG_1743.JPG
    IMG_1743.JPG
    101.1 KB · Views: 4,554
  • IMG_1744.JPG
    IMG_1744.JPG
    93.6 KB · Views: 4,539
  • IMG_1746.JPG
    IMG_1746.JPG
    103.4 KB · Views: 4,528
  • IMG_1747.JPG
    IMG_1747.JPG
    111.1 KB · Views: 4,523
  • IMG_1753.JPG
    IMG_1753.JPG
    99.6 KB · Views: 4,533
Last edited:
The 12" travel remote reservoir Bilstein 7100 shocks finally came in.

attachment.php


Darren finished up the frame side of the trackbar mount.

attachment.php


attachment.php


He also finished off the mounts on the front housing and finished welding on the lower link mounts.

attachment.php


attachment.php
 

Attachments

  • IMG_1755.JPG
    IMG_1755.JPG
    65.4 KB · Views: 4,525
  • IMG_1758.JPG
    IMG_1758.JPG
    60.3 KB · Views: 4,524
  • IMG_1760.JPG
    IMG_1760.JPG
    93.8 KB · Views: 4,489
  • IMG_1761.JPG
    IMG_1761.JPG
    108.3 KB · Views: 4,533
  • IMG_1759.JPG
    IMG_1759.JPG
    87 KB · Views: 4,493
Last edited:
The knuckle's were tacked into place and checked for proper alignment.

attachment.php


attachment.php


attachment.php


attachment.php


With the alignment set the knuckles were welded permanently into place. Darren did the welding while Chad slowly rotated the housing.

attachment.php


The housing was then reinstalled and mock-up of the steering began.

attachment.php


attachment.php


attachment.php
 

Attachments

  • IMG_1762.JPG
    IMG_1762.JPG
    112.9 KB · Views: 2,406
  • IMG_1763.JPG
    IMG_1763.JPG
    91 KB · Views: 2,451
  • IMG_1764.JPG
    IMG_1764.JPG
    108.9 KB · Views: 2,418
  • IMG_1765.JPG
    IMG_1765.JPG
    111 KB · Views: 2,414
  • IMG_1766.JPG
    IMG_1766.JPG
    113.7 KB · Views: 2,424
  • IMG_1767.JPG
    IMG_1767.JPG
    103.4 KB · Views: 2,333
  • IMG_1768.JPG
    IMG_1768.JPG
    102.2 KB · Views: 2,312
  • IMG_1769.JPG
    IMG_1769.JPG
    94.1 KB · Views: 2,333
Last edited:
Jeff,
any update pics I can stare at the weekend? :icon_eek:

I'll do my best paul to get not only this build but two others caught up this weekend. I plan on sitting in front of the computer all day tomorrow playing the role of book keeper & web dude updater! Stay tuned!
 
Jeff you're a victim of your own success...everybody wants to see what you and your crew come up with next. :cool: cheers!
 
Getting back to the front suspension the next thing we needed to do was come up with a strong and simple hoop for the coilover that would work on both the left and right sides. On the driver side we have the steering box and shaft in the way and on the passenger side the alternator was going to be problem. So a pair of hoops were bent up with the driver side being slightly different but mounting points of the coilover are the same.

attachment.php


attachment.php


attachment.php


For extra strength both sides of the frame were drilled so that the hoop would pass thru the entire frame.

attachment.php


attachment.php


Not sure why I don't have any pictures of the driver side hoop but I will with the next update. Also, oval mounting plates will be added to the frame around each tube for additional strength.
 

Attachments

  • IMG_1907.JPG
    IMG_1907.JPG
    116.8 KB · Views: 2,318
  • IMG_1911.JPG
    IMG_1911.JPG
    79.5 KB · Views: 2,283
  • IMG_1934.JPG
    IMG_1934.JPG
    122.6 KB · Views: 2,297
  • IMG_1935.JPG
    IMG_1935.JPG
    111.1 KB · Views: 2,310
  • IMG_1939.JPG
    IMG_1939.JPG
    104.4 KB · Views: 2,317
Last edited:
Back
Top