This 1963 Scout 80 is a recently completed project of ours. We started this build in late November 2006 and finished it 4 weeks later. Aside from starting with a painted body and a rebuilt engine we had to rebuild and assemble everything else from scratch. As the story goes, the owner Tom had this vehicle worked on by several other shops none of which were reliable enough to complete the project. Twice he had a shop bail out on him only to go retreive the Scout and bring it back home. When Tom came to me he was pretty "gun shy' so to speak but I assured him we would not only get his Scout back on the road, but do it in only a short few weeks and have a rig that was better than new. When Tom arrived he had the little green Scout in tow with a pick-up bed full of parts.
So here's breakdown of what was to be done:
inspect and install 152 4 cyl rebuilt engine
rebuild the t90 transmission and Dana 20 transfer case
install rebuilt Scout II Dana 44 axles with 4.27 gears and front disc brakes
install power steering
install Scout II front leaf springs and a CPT reverse shackle kit
all new wiring
reassemble remaining vehicle parts
here are pics at the begining. We had already stripped the Dana 27 axles from the Scout and the leafsprings. The bottom pic shows the freshly built rear Dana 44.
Another pic
So here's breakdown of what was to be done:
inspect and install 152 4 cyl rebuilt engine
rebuild the t90 transmission and Dana 20 transfer case
install rebuilt Scout II Dana 44 axles with 4.27 gears and front disc brakes
install power steering
install Scout II front leaf springs and a CPT reverse shackle kit
all new wiring
reassemble remaining vehicle parts
here are pics at the begining. We had already stripped the Dana 27 axles from the Scout and the leafsprings. The bottom pic shows the freshly built rear Dana 44.
Another pic